Specifications include, but are not limited to: Sitework:1.Regrading, replacement of parking area, playground hard surfaces, sidewalk, and landscape. Provide new marquee sign.Architecture•Provide front entry canopy and secure vestibule, replace exterior waterproofing/sealant joints, exterior windows. Exterior surfaces power-washed and paint exterior surfaces. Repair exteriorwall cladding. Provide modified bitumen replacement roof system. Renovation of administration suite. Replace classroom casework. Replace floor finishes, walls and ceilings. Provide gymnasium padding, backboards, goals and supportsMechanical•Chiller pumps and HVAC units Replacement supports. Replace IDF/MDF air conditioning and Main Office split system AC units.Plumbing•Replace chiller water piping, chilled water pumps, heating water pumps, heating water piping, cold water piping, hot water piping, hose bibs, gas piping, grease waste piping, and waste piping. Electrical•Provide exterior LED lighting and controls. Provide interior LED lighting and controls. Replace fire alarmsystem. Replace intercom system.Safety & Security•Provide upgraded access control system. Add security screens at first floor windows