Specifications include, but are not limited to: ROOF, ALL LAYERS TO BOARD ON BOARD: 07-302B: To include but not limited to removal and disposal of all roofing debris, replacement of rotted or damaged decking up to 32 SF, Installation of composition shingles in accordance with 07-310 and 14" wind turbines to accommodate the attic space in accordance with 10-210(E). ELECTRICAL-SERVICE PANEL - 200 AMP: 16-600J: COMPLETE with green tag. (Install/Replace). Installation is to include 200 amp service panel, meter box, service mast, mast head ,etc. and sealing of all holes and penetrations such as flashing and sealant. Installation will include re-connection fee. Permit must reflex the actual work being performed such as electrical panel (service upgrade, etc.).