Specifications include, but are not limited to: clearing and grubbing, existing asphalt saw cut, subgrade removal and disposal, preparation and installation of new asphalt section, ADA striping, ADA signage, truncated domes, bollards, surface repair, and installation of erosion control measures during construction. Bid alternate 1 to include clearing and grubbing, existing asphalt saw cut, subgrade removal and disposal, preparation and installation of new concrete valley gutter, surface repair, and installation of erosion control measures during construction. Bid alternate 2 to include existing subgrade removal, preparation and installation of new concrete pavement beneath existing parking structure, surface repair, and installation of erosion control measures during construction.