Specifications include, but are not limited to: This project will consist of, but not be limited to the installation of a Provide a new standby power system designed to interrupt and refeed an existing, three-phase, overhead, 4160 volt power line, in the area of Building 121. This new power system will consist of twin, paralleled, 600 KW, 480 volt, diesel-fueled generators, a step-up transformer, and mediumvoltage, closed-transition transfer switch, designed to produce and manage standby power, in support the existing 4160 volt electrical systems feeding the existing Barracks and other buildings off the West Hill Road system, in the event of a utility power outage; labor and materials as indicated on the drawings.