Specifications include, but are not limited to: MSRP - ROOF, ALL LAYERS TO LATH: 07-301: To include but not limited to removal and disposal of all roofing debris, Installation of all decking in accordance with 07-315B, composition shingles in accordance with 07-310 and 14" wind turbines to accommodate the attic space in accordance with 10-210(E). Comments: 10% waste . MSRP - ELECTRICAL-SERVICE PANEL - 200 AMP: 16-600J: COMPLETE with green tag. (Install/Replace). Installation is to include 200 amp service panel, meter box, service mast, mast head ,etc. and sealing of all holes and penetrations such as flashing and sealant. Installation will include re-connection fee. Permit must reflex the actual work being performed such as electrical panel (service upgrade, etc.). These can be indicated under the notes section on the online application. All materials and/or equipment demolished or repaired are considered salvage and belong to the homeowner for use or disposal unless the homeowner relinquishes salvage rights to the contractor (Contractors Bid Accordingly). The contractor must remove all unwanted material and debris. .MSRP - DWV, COMPLETE SYSTEM: 15-303: Installation to include removal of entire existing DWV system; to include p-traps to bottom of sink drain. To include proper strapping to floor joist, Clean outs and the vent stacks must protrude to the exterior of the dwelling with proper new flashing. If contractor cannot remove a vent the Housing Inspector must approve the use of a mechanical vent prior to installation otherwise contractor maybe subject absorbing the cost of that opening. All wall, ceiling and roof penetrations must be properly sealed. Enter (OP) for openings. All materials and/or equipment demolished or repaired are considered salvage and belong to the General Contractor for use or disposal