Specifications include, but are not limited to:1.00 LS CLEARING AND GRUBBING874,981.00 CY EXCAVATION AND EMBANKMENT10.00 EACHSETTLEMENT PLATFORM2.00 EACHSETTLEMENT MONUMENT379,221.00 SY SUBSOIL TILLAGE3,710.00 CY WETLAND MITIGATION BERM3,850.00 CY EXCAVATION AND BACKFILL FOR STRUCTURES1,570.00 CY EXCAVATION AND BACKFILLI NG FOR PIPE TRE4,279.00 CY BORROW, TYPE B8.00 EACHABANDONMENT OF WELLS2,629.00 CY GRADED AGGREGATE BASE COURSE, TYPE B908.00 TON DELAWARE NO. 3 STONE130.00 TON DELAWARE NO. 57 STONE71,946.00 SY PERMEABLE TREATED BASE, 4"70,088.00 SY SOIL CEMENT BASE COURSE, 6"1,247.00 TON PORTLAND CEMENT623.00 TON BIT CONC, SP, TY C, 160 GYRA, PG 64-22 ( 225.00 TON BIT CONC, SP, BCBC, 160 GYRA, PG 64-22 71,777.00 SY PORTLAND CEMENT CONCRETE PAVEMENT, 12" 60.00 CY PORT CEMENT CONCRETE MASONRY, CLASS A 111.00 CY PORT CEMENT CONCRETE MASONRY, CLASS B 278.00 CY PCC MASONRY, ABUTMENT FOOTING, CLASS B 509.00 CY P.C.C. MASONRY, SUPERSTRUCTURE CLASS D 428.00 CY P.C.C. MASONRY APPROACH SLAB, CLASS D 410.00 CY PCC MASONRY, ABUT ABOVE FOOTING, CLASS A 109.00 CY P.C.C. MASONRY, PARAPET, CLASS A 2.00 LS MECHANICALLY STABILIZED EARTH WALLS 36,900.00 LB BAR REINFORCEMENT 282,922.00 LB BAR REINFORCEMENT, EPOXY COATED 1.00 LS GRND MOUNT BREAKAWAY SIGN SUPPRT & FND 90.00 LF PREFABRICATED EXPANSION JOINT SYSTEM, 4" 285.00 TON COARSE AGGR FOR FND STAB & SUBFND BCKFL 4,174.00 LF REINFORCED CONCRETE PIPE, 15", CLASS IV 1,850.00 LF REINFORCED CONCRETE PIPE, 18", CLASS IV 589.00 LF REINFORCED CONCRETE PIPE, 24", CLASS IV 32.00 LF REINFORCED CONCRETE PIPE, 21", CLASS IV 190.00 LF REINFORCED CONCRETE ELLIPTICAL PIPE, 38" 253.00 LF REINFORCED CONCRETE ELLIPTICAL PIPE, 14" 237.00 LF REINFORCED CONCRETE ELLIPTICAL PIPE, 48" 190.00 LF REIN CONC ELLIP PIPE, 53"X83", CLASS IV 3.00 EACH R.C. FLARED END SECTION, 15" 16.00 EACH R.C. FLARED END SECTION, 18" 2.00 EACH R.C. FLARED END SECTION, 21" 6.00 EACH R.C. FLARED END SECTION, 24" 3.00 EACH R.C. FLARED END SECTION, 14"X23" Contract #T200911301.01 , Page 35,220.00 LF STEEL H PILES, HP 14 X 73220.00 LF STEEL H TEST PILES, HP 14 X 733,480.00 LF FURNISH PRECAST PRESTRESSED CONCRETE PIL160.00 LF FURNISH PRECAST PRESTRESSED CONCRETE TES5,220.00 LF INSTALL STEEL H PILES, HP 14 X 73220.00 LF INSTALL STEEL H TEST PILES, HP 14 X 733,480.00 LF INSTALL PRECAST PRESTRESSED CONCRETE PIL160.00 LF INSTALL PRECAST PRESTRESSED CONCRETE TES1.00 EACHPRODUCTION PILE RESTRIKE1.00 EADYTEST PILE RESTRIKE8.00 EACHDYNAMIC PILE TESTING BY CONTRACTOR8.00 EACHSIGNAL MATCHING ANALYSIS BY CONTRACTOR1.00 LS PRESTRESS REIN CONC MEMBERS, BULB T BEAM3,983.00 LF IPCC CURB & GUTTER, TYPE 1-450.00 EACHUNDERDRAIN OUTLET3.00 EACHDRAINAGE INLET, 34" X 18"14.00 EACH DRAINAGE INLET, 34" X 24" 23.00 EACH DRAINAGE INLET, 48" X 30" 2.00 EACH MANHOLE, 48" X 30" 405.00 SY RIPRAP, R-4 870.00 SY RIPRAP, R-5 87.00 TON RIPRAP, R-4 130.00 TON RIPRAP, R-5 242.00 TON RIPRAP, R-6 192.00 CY CHANNEL BED FILL 60.00 CY RIFFLE GRADE CONTROL MATERIAL 7,142.00 SY GEOTEXTILES, SEPARATION 1,634.00 SY GEOTEXTILES, RIPRAP 19,888.00 LF PERFORATED PIPE UNDERDRAINS, 6" 1,830.00 LF UNDERDRAIN OUTLET PIPE, 6" 200.00 LF TEMPORARY DRAINAGE PIPE, 30" 280.00 LF TEMPORARY DRAINAGE PIPE, 24" 500.00 LF TEMPORARY DRAINAGE PIPE, 36" 4,513.00 LF GALVANIZED STEEL BEAM GUARDRAIL, TY 1-31 165.00 EACH POST MOUNTED DELINEATORS 6.00 EACH GUARDRAIL END TREATMENT ATTEN.,TY 1-31 4.00 EACH GUARDRAIL TO BARRIER CONN. (EXIT TY 31) 6.00 EACH G/R TO BARR. CONN., APPROACH TY 1-31 4.00 EACH END ANCHORAGE 31 19,440.00 LF RIGHT-OF-WAY FENCE 16.00 EACH RIGHT-OF-WAY FENCE GATE 11,378.00 LF CONSTRUCTION SAFETY FENCE 15,531.00 LF RESOURCE PROTECTION FENCE 50.00 ACRE HERBICIDE APPLICATION, NOXIOUS WEEDS 1.00 LS PLANTINGS 1,256.00 EACH LIVE STEM STAKING 1.00 LS MAINTENANCE OF TRAFFIC