Specifications include, but are not limited to:The installation will be so that its component parts function together as a workable system. It will be complete with all accessories necessary for its operation and will be left with all equipment in proper adjustment and in operative condition. Electrical Contractor will provide all items, articles, materials, operations or methods listed, mentioned or scheduled on the work write-up, in the specifications and per local electrical codes, including all labor, materials and incidentals necessary and required for their completion and proper operation. 16410- ELECTRIC SERVICE REQUIREMENTS: In cases that the entire electrical system is being replaced from the meter box into the structure, no service will be installed which is less than 200 amps, 220 v., single phase service. Replace service riser, weather head, service wire, meter box, and meter accordingly and verify that existing service wires will deliver the capacity required for the new service. If capacity is insufficient, coordinate change of such wires with the local Utility Co.