Specifications include, but are not limited to:GENERAL ELECTRICAL: The following are the minimum requirements that will govern unless superseded by more restrictive Federal, State, 2008 National Electrical Code (NEC) and / or City of Dallas Codes and Ordinances. A rough and a final ‘Green Tag’ (may be provided on a single “tag”) will be required for all work completed under this Section / Division. The installation will be so that its component parts function together as a workable system. It will be complete with all accessories necessary for its operation and will be left with all equipment in proper adjustment and in operative condition. Electrical Contractor will provide all items, articles, materials, operations or methods listed, mentioned or scheduled on the work write-up, in the specifications and per local electrical codes, including all labor, materials and incidentals necessary and required for their completion and proper operation. Current codes will refer to the 2008 National Electrical Code (NEC) and the City of Dallas Electrical Codes. In the event of any discrepancies between the Work Write-Up and the requirements of the project, immediately notify the Housing Inspector. Do not proceed in areas of discrepancies until such matters have been addressed or resolved. 16020- WORK NOT INCLUDED: Service work from the Power Pole or Supply to the Structure will be by the Utility Co, Contractor to schedule all work to be provided by the Utility Co. so it coincides with completion of his/her work as required by the contract.