Specifications include, but are not limited to: The project will provide selective asbestos abatement in association with the installation of a fire suppression system and other life safety upgrades to the existing multi-story Museum building. The heating, ventilation, and air conditioning components of the buildings infrastructure that support the life safety system, as well as the buildings electrical systems, and affected interior finishes will be upgraded as required. The water utility infrastructure serving the museum and several other facilities in the area will require a piping upgrade in order to provide proper pressure and flow for the new fire suppression system. Modifications to the current HVAC systems as outlined in the 2013 Fanning and Fanning Report and replacement of 2 Museum air handlers #4 and 5. The project will be designed to comply with all applicable federal , state and local laws, regulations, and codes; thereby bring the existing building into full life safety compliance.