Specifications include, but are not limited to:YPICAL PROJECT SYSTEMS TO BE COMMISSIONED: List of systems to be commissioned on individual projects will vary and may include, but not be limited to the following: • Building HVAC System • Building Plumbing • Building Electrical and lighting systems • Building Envelope • Energy Management System o Distributed Control Systems (DCS) o Building Automation Systems (BAS) o Lighting Control System • Building Emergency power o Generators o Uninterruptable Power Supply (UPS) • Conveyances o Elevators o Escalators o Moving Sidewalks • Electrical Systems o Airfield lighting systems Vaults Lighted Signs In-pavement lights Elevated lights Wind cones o Street Lighting o Parking Lot lighting • Specialized Airport Systems o Passenger Boarding Bridges • Commissioning Project Management Duties • Commissioning Project Administration Duties • Development of Owner's Project Requirement Document (OPR) • OPR Workshop with Nominal Group Technique (NGT) Survey • Identify Scope & Budget for Commissioning Process • Develop Initial Commissioning Plan • Establish Issues Log Procedures • Prepare Commissioning Process Progress Reports • Develop Design Phase Acceptance Requirements • Design Phase Documentation Records • Design Phase Cx Meetings • Develop Performance Verification Test Procedures (PVT) • Establish Systems Manual Requirements • Identify Training Requirements ECT...