Specifications include, but are not limited to: 50.00 EADY FURN & MAINT PORT LIGHT ASSEMBLY 10.00 HOUR TRAFFIC OFFICERS 26.00 EADY FURNISH & MAIN. TMA, TYPE II 40.00 HOUR FLAGGER, NEW CASTLE COUNTY 40.00 HOUR FLAGGER, KENT COUNTY 40.00 HOUR FLAGGER, SUSSEX COUNTY 6.00 HOUR FLAGGER, NEW CASTLE COUNTY, STATE, OVERT 6.00 HOUR FLAGGER, KENT COUNTY, STATE, OVERTIME 6.00 HOUR FLAGGER, SUSSEX COUNTY, STATE, OVERTIME 1.00 EACH WOODEN SIGN POSTS, 4" X 4" 1.00 EACH WOODEN SIGN POSTS, 4" X 6" 1.00 EACH WOODEN SIGN POSTS, 6" X 6" 1.00 EACH WOODEN SIGN POSTS, 6" X 8" 3.00 EACH FURNISH & INSTALL DOWN GUY AND ANCHOR Contract #T201408302.01 , Page 21,000.00 LF FURNISH & INSTALL SPAN WIRES, 7/16"125.00 LF FURNISH & INSTALL SPAN WIRE, 3/8"125.00 LF FURNISH & INSTALL SPAN WIRE, 1/4"5.00 EACHINSTALLATION OF STEEL POLE (LESS THAN 401.00 EACHINSTALLATION OF STEEL POLE (EQUAL TO OR10.00 EACHADJUSTMENT OF SPAN OR MESSENGER WIRE3.00 EACHINSTALLATION OF SIDEWALK GUY AND ANCHOR3.00 EACHREMOVAL OF DOWN GUY AND ANCHOR3.00 EACHINSTALLATION OF OVERHEAD GUY5.00 EACHREMOVAL OF STEEL POLE (EQUAL TO OR GREAT1.00 EACHREMOVAL OF STEEL POLE (EQUAL TO OR GREAT3.00 EACHREMOVAL OF SIDEWALK GUY AND ANCHOR10.00 EACHSPAN WIRE ATTACHMENT BETWEEN POLES10.00 EACHREMOVAL OF SPAN WIRE ATTACHMENT3.00 EACHTRANSFER OF SPAN WIRE50.00 EACHINSTALLATION OF SIGN OVERLAY 16 S.F. OR5.00 EACH INSTALLATION OF SIGN OVERLAY OVER 16 S.F 50.00 EACH REINFORCED CONC SIGN FOUNDATION, W-6 7.00 EACH REINFORCED CONC SIGN FOUNDATION, W-8 5.00 EACH REINFORCED CONC SIGN FOUNDATION, W-10 5.00 EACH REINFORCED CONC SIGN FOUNDATION, W-12 5.00 EACH REINFORCED CONC SIGN FOUNDATION, W-14 888.00 LF SUPP OF BREAKAWAY I-BEAM SIGN POSTS, W-6 100.00 LF SUPP OF BREAKAWAY I-BEAM SIGN POSTS, W-8 31.00 LF SUPP OF BREAKAWAY I-BEAM SIGN POST, W-10 31.00 LF SUPP OF BREAKAWAY I-BEAM SIGN POST, W-12 100.00 LF SUPP OF BREAKAWAY I-BEAM SIGN POST, W-14 1.00 CF SIGN BASE EXTENSION 1.00 CF STRUCTURAL CONCRETE 1.00 EACH INSTALLATION OF SIGN BASE SHEETING 25.00 CF REMOVAL OR GRADING OF MASONRY 75.00 EACH SUPP & INST OF BOLT KIT FOR BRKAWY COUP 40.00 EACH SUPP & INST OF HGE PLT FOR BRKAWY COUP 25.00 EACH SUPP & INSTA OF BREAKAWAY COUPLING SYS 10.00 EACH REMOVAL OF OVERHEAD I-BEAM 5.00 EACH INSTALLATION OF OVERHEAD I-BEAM 5.00 EACH RELOCATION OF OVERHEAD I-BEAM 25.00 EACH REMOVAL OF LIGHTING UNIT 25.00 EACH CUTTING OF OVERHEAD I-BEAMS 400.00 EACH REMOVAL OF STANDARD GROUND MOUNTED METAL 2.00 EACH REMOVAL OF GROUND MOUNTED WOOD POST 2.00 EACH SUPPLY AND INSTALLATION OF DRY CONCRETE 3.00 LF SUPPLY OF OVERHEAD I-BEAM, W-6 25.00 EADY NIGHT, EMERGENCY, WEEKEND WORK 75.00 EACH INSTALLATION OF BREAKAWAY I-BEAM SIGN PO 50.00 EACH REMOVAL OF BREAKAWAY I-BEAM SIGN POSTS 7,500.00 SF INSTALLATION OF SIGN ON/OVER HIGHWAY STR