Specifications include, but are not limited to: This work consists of removing and disposing of raised pavement markers at locations noted on the Plansand filling in the void with patching material.Materials:A cementitious, rapid setting, semi-leveling mortar mix with a gel state consistency shall be used for fillingin the voids. The rapid setting mortar mix shall have a 4-6 minute working time and reach a minimum compressivestrength of 3,000 psi within 60 minutes.The material shall be approved by the Engineer prior to placement. Construction Methods:The Contractor shall remove raised pavement markers minimizing damage to the existing pavement. TheContractor may use a back hoe or hand tool to remove the raised pavement marker. The method of removalof the raised pavement marker shall be approved by the Engineer.Immediately after removing the raised pavement marker, the Contractor shall remove all loose debris fromthe void, dry the void, and fill the void with the approved patching material. The patching material shall bemixed and placed according to the manufacturer’s recommendations.Method of Measurement:The quantity of removal of raised pavement markers will be measured as the actual number of eachpavement marker removed.Basis of Payment:The quantity of removal of pavement markers will be paid for at the Contract unit price of each. Price andpayment will constitute full compensation for all labor, equipment, tools, patching materials, disposal of thepavement markers, and incidentals required to complete the work.