Specifications include, but are not limited to: 1. Assist in the development of design intent and basis of design documentation for mechanical and lighting systems (LEED – Commissioning req.) 2. Perform design review of HVAC concepts and construction documents. (LEED – E&A credit 3.0 – Enhanced Commissioning) 3. Assist in the development and integration of commissioning requirements into the contract plans and specifications. (LEED – Commissioning req.) 4. Develop a construction phase commissioning plan. (LEED Commissioning req.) PHASE TWO – CONSTRUCTION PHASE 1. Review selected submittals for commissioning and operations facilitation. (LEED – E&A credit 3.0 – Enhanced Commissioning) 2. Observation and verification of construction and installation. Assistance in coordination of building systems and preparation of final commissioning plan for required city and functional testing. (LEED – Commissioning req.) 3. Observation and verification of start up and initial checkout. This section will include enhancement of the commissioning plan with the contractors, and building and system punch lists to assist the contractor in setting priorities and completing the building. (LEED – Commissioning req.) 4. Verification of HVAC System Test and Balance. (LEED – Commissioning req.) 5. Observation of Functional and Performance Testing of HVAC Systems and documentation (LEED – Commissioning req.) (Does not include coordination of contractor repairs) 6. Observation of Functional and Performance Testing of Lighting Control Systems and documentation (LEED – Commissioning req.) (Does not include coordination of contractor repairs) 7. Documented verification and assistance in the preparation of Systems manuals and Operation and Maintenance manuals. This section provides for a standardized arrangement of O&M documents verified for application to the actual equipment installed. Design, testing, and operations documentation is integrated into one package to facilitate building operation. (LEED – E&A credit 3.0- Enhanced Commissioning)