Specifications include, but are not limited to: Contractor shall provide equipment capable of supplying at least 34,000 pounds of known weight. Known weight shall include at least 20,000 pounds of test weight. B. Contractor shall check-in and check-out with the on-site contact upon each service call to provide verification the service has been provided. C. Routine service to be performed semi-annually. Contractor shall notify the on-site contact of the date and time the services will be performed one (1) week prior to the actual work. D. Contractor shall take all necessary precautions to protect service locations. Any damage caused by Contractor to state equipment, materials, or other priority shall be repaired or replaced by Contractor to the satisfaction of the state at no cost to the state. The state may, at its option, repair any damage and deduct from Contractor the cost thereof. E. Contractor shall take measures to see that all materials left as a result of the work shall be removed.