Specifications include, but are not limited to:The scope of Part A of the Project is the replacement of the existing roofing system on Roof Sections 1-11 of the Corpus Christi Museum of Science and History including roof membranes system, flashing membrane systems, rigid board roof insulation system, sheet metal flashing and trim, roof-mounted equipment and curbs, roofing related components and assemblies, and exterior ductwork at Discovery Dome HVAC unit. 2.Part B – Curtain Wall Replacement: The Scope of Part B of the Project is the replacement of the existing two story aluminum and glass curtain wall system located on the east end of the Children’s Area with a new windstorm impact-rated aluminum and glass curtain wall system. Also included is the repair and repainting of the existing steel structural framing supporting the aluminum and glass curtain wall system