Specifications include, but are not limited to: The demolition and renovation scope will be approximately 633GSF of the existing space in the Jonsson Building K, level 1. This space will require the demo and removal including but not limited to existing flooring, base, walls, ceilings, work benches, room signs, ductwork, lights, doors, door frames, shelving, cabinetry, all wall mounted equipment and brackets, walk off mats, fire sprinklers, fire alarm devices, HVAC equipment, all abandoned ductwork and electrical conduit, electrical equipment, sanitary piping, electrical receptacles, lighting, switches, smoke detectors, all A/V devices and equipment, security devices and equipment, and J-boxes. Contractor is responsible for removal of all existing electrical, mechanical and plumbing that does not meet UTSW standards and specification, electrical conduit, all wiring, all switches, and telephone as shown on the drawing