Specifications include, but are not limited to: The demolition and renovation scope will be approximately 1,709 GSF of the existing space in the Pickens Research Building ND, level 10. This space will require the demo and removal including but not limited to existing flooring, base, walls, ceilings, work benches, epoxy tops, base cabinets, room signs, ductwork, lights, doors, door frames, shelving, cabinetry, all wall mounted equipment and brackets, walk off mats, fire sprinklers, fire alarm devices, HVAC equipment, all abandoned ductwork and electrical conduit, electrical equipment, sanitary piping, electrical receptacles, lighting, switches, smoke detectors, all A/V devices and equipment, security devices and equipment, electrical panels, disconnects, electrical transformers, J-boxes, contractor is responsible for removal of all existing electrical, mechanical and plumbing that does not meet UTSW standards and specification, electrical conduit, all wiring, all switches, and telephone as shown on the drawings