Specifications include, but are not limited to: 3.1. The activities and submittals completed by the Commissioning Authority during the Assessment Phase include: 3.1.1. Define Owner’s EBCx Goals and Objectives 3.1.2. Establish Baseline Performance Data for systems shown on Construction Documents produced in the 2019 calendar year that include but are not limited to the systems outlined under paragraphs 3.5.1 – 3.5.3 3.1.3. Develop Current Facility Requirements (CFR) 3.1.4. Develop the Initial EBCx Plan 3.1.5. Establish the Systems Manual Outline and gather Existing Manuals 3.1.6. Perform Assessment 3.1.7. Initiate EBCx Report with Assessment Report 3.2. The Commissioning Process activities completed by the Commissioning Authority during the Investigation Phase include: 3.2.1. Perform Site Investigation, Functional Testing and Balancing 3.2.2. Provide Testing and Balancing Report 3.2.3. Perform Issue and Opportunity Analysis 3.2.4. Update EBCx Report with Investigation Report 3.3. The Commissioning Process activities accomplished by the Commissioning Authority during the Hand-Off Phase include: 3.3.1. Develop On-going Commissioning Plan 3.3.2. Assemble Systems Manual 3.3.3. Train Facility Personnel 3.3.4. Verify Training Effectiveness 3.3.5. Finalize EBCx Report 3.3.6. Provide Project Documents to Owner .4. The following buildings with the specified systems and assemblies are the focus of the Existing Building Commissioning Process: 3.4.1. Hall of State – 3939 Grand Avenue 3.4.1.1. Chilled water system 3.4.1.2. Hot water system 3.4.1.3. Building Automation System 3.4.1.4. HVAC air distribution system (includes balancing) 3.4.1.5. Exterior lighting system 3.4.1.6. Sump pumps (inside and outside) 3.4.2. Coliseum – 1438 Coliseum Drive 3.4.2.1. Chilled water system 3.4.2.2. Hot water system 3.4.2.3. HVAC air distribution (includes balancing) 3.4.2.4. Interior lighting system 3.4.3. African American Museum – 3536 Grand Avenue, 3 Stories, 34,144 sf (drawings attached) 3.4.3.1. Chilled water system 3.4.3.2. Hot water system 3.4.3.3. Building Automation System 3.4.3.4. HVAC air distribution (includes balancing) 3.4.3.5. Interior lighting system