Specifications include, but are not limited to: EXPLORATORY EXCAVATION 12 HR 2 TYPE P SURFACE RESTORATION (5" asphaltic concrete roadway) 1626 SY 3 WATER MAIN PIPE - 8" PVC C900 (includes excavation, bedding, pipe, and backfill) 950 LF 4 WATER MAIN FITTING - 8" DI- TEE 2 EA 5 WATER MAIN FITTING - 8" DI- CROSS 1 EA 6 WATER MAIN FITTING - 8" DI - 45 DEGREE ELBOW; 10 WATER MAIN FITTING - 10" DI - LONG SLEEVE 1 EA 11 WATER MAIN FITTING - 6" DI - LONG SLEEVE 1 EA 12 VALVE - 8" GATE VALVE (includes valve box) 10 EA 13 FIRE HYDRANT ASSEMBLY (includes excavation, bedding, pipe, valves, valve boxes, fittings, and backfill) 2 EA 14 1" WATER SERVICE CONNECTION (includes excavation, bedding, pipe, valves, valve boxes, fittings, and backfill) 8 EA 15 GRAVITY SEWER PIPE - 8" SDR 35 PVC (includes excavation, bedding, pipe, and backfill) 241 LF 16 SANITARY SEWER MANHOLE 2 EA 17 Main Line Clean-out-Size 8" 1 EA 18 Sewer Service Line - Size 4".