Specifications include, but are not limited to:The demolition and renovation scope will be approximately 391 GSF of the existing space in the Simmons Biomedical Building NB for Genetics of Host Defense..The installation precedence of materials shall be as follows. Note that if an interference is encountered, this shall guide the contractor in the determination of which trade shall be given the "Right-of-Way". 1. Building lines 2. Structural Members 3. Soil and Drain Piping 4. Vent Piping 5. Supply, Return, and Outside Air Ductwork 6. Exhaust Ductwork 7. HVAC Water and Steam Piping 8. Condensate Piping 9. Fire Protection Piping 10. Natural Gas Piping 11. Domestic Water (Cold and Hot) 12. Refrigerant Piping 13. Electrical Conduit