Specifications include, but are not limited to: The improvements consist of furnishing all labor and materials for this project. The purpose of this contract is to remove existing guardrail turned down ends, replace with approved attenuators as required, and to perform other guardrail component upgrades, grading, curb removal and replacement as directed in the field by the Engineer. Also included are sidewalk and/or bike/ped path removal and replacement resulting from the guardrail repairs. Features requiring ADA upgradesfor compliance with currentstandards may also be performed if within the limits of the guardrail work. Topsoil, seeding and mulching of exposed areas will be included. Maintenance of traffic in accordance with the latest edition of the Delaware MUTCD will also be part of this contract. The work will be performed on State maintained roadways within the North District as directed in the field. Maps delineating the approximate boundaries of the North District maintenance areas are included following these project notes. The specific work sites are not listed herein, but will be assigned as available by North District maintenance, and other incidental construction in accordance with the location, notes and details shown on the plans and as directed by the Engineer.