Specifications include, but are not limited to: The existing 69kV single circuit, steel pole line at P#s 52-56 is to be relocated off the road to allow for turn lanes and driveway entrance into the new solar farm. The new alignment is approximately 875 ft. in length and may include the transfer of the existing distribution under-build to the new galvanized steel poles on new fiberglass distribution arms and hardware. The relocation of the distribution nay be done bu Dover crews and therefore should be bid as a separate line item for this RFP. The 69kV conductor is single 795 ASCR Drake conductors and the OHGW is 7#10 Alumoweld. The scope may include removal and salvage of the old steel poles and hardware and should also be bid as a separate line item for this RFP.