Specifications include, but are not limited to: A. Access to water for use by Contractor will be made available at each location. B. Contractor shall check-in with the Facility On-Site Contact or designee upon each service call to provide verification the service has been provided to the satisfaction of the Facility On-Site Contact or designee. C. Routine service to be performed semi-annually. Contractor shall notify the Facility On-Site Contact or designee of the date and time the service is to be performed one (1) week prior to the actual work. Contractor must respond to miscellaneous service call-outs within twenty-four (24) hours after notification from the Facility On-Site Contact or designee. D. Contractor shall steam clean the concrete portions of the roadway/parking lot surfaces located at the facility (including the concrete platform scale surface) and the floors of the inspection bays. Additionally, at facilities where pit inspection lanes are used, Contractor shall steam clean floors, walls, and covers of the pits. E. Scrubbing and/or brushing may be required to adequately clean surfaces prior to steam cleaning. F. Contractor shall clean up, remove and dispose of effluent waste caused by the steam cleaning at no additional cost to the state.