Specifications include, but are not limited to: demolition and renovations to portions of the existing building and a building expansion to enlarge the existing kitchen. Site improvements including revising three existing staff parking areas into one larger lot, to allow student drop-off and access to the kitchen loading dock. The new parking area and building addition will require a new SWM area and relocation of playground equipment. The existing kitchen will be demolished and a larger kitchen and loading dock will be incorporated in the new design. Building renovations include ADA improvements throughout the building including modifications to toilet rooms, new doors and door hardware. New lockers will be located in classrooms and new ceiling systems will be installed. MEP work includes new branch plumbing and fixtures in all toilet rooms, new boiler sys- tem, and addition of a sprinkler system. New energy efficient lighting will replace existing throughout and the fire alarm system will be upgraded.