Specifications include, but are not limited to: The scope of work consists of renovation of the Sarcoma clinic & Waiting Room - R9. Replacement in-kind of existing finishes. Construction to include the installation of: 1. Relocation of existing reception area and construction new reception area 2. Replacement of existing brad packs sinks with porcelain wall hung sinks 3. Tile, Acoustical Ceilings, Solid Surface Counters and Paint. 4. Acoustical ceilings. 5. Solid surface counters 6. Patch and paint walls, door frames and ceiling as required 7. Plastic Laminate Toilet Compartments and Toilet Accessories. 8. New automatic door operators for entry doors where required 9. Replacing of HVAC Mechanical systems 10. Electrical and plumbing work as required.