Specifications include, but are not limited to:WORK Lockhart State Park Project #122922 CCC Built Recreation Hall Renovations HVAC Work HVAC Scope of Work Summary: Contractor shall furnish all labor, tools, equipment, materials and incidentals to provide all building related HVAC work at Lockhart State Park Recreation Hall as set forth in the Bidding and Contract Documents. The scope of work for the project is defined by the construction drawing set entitled “Lockhart State Park- CCC Built Recreation Hall Renovations” all sheets dated 07-01- 2014 (unless dated otherwise by revision date shown): Number Sheet Title Revision Date - COVER SHEET G1 GENERAL NOTES G2 SYMBOLS, ABBREVIATIONS AND ACCESSIBILITY 10-01-2014 G3 WINDOW AND DOOR SCHEDULES G4 GENERAL CONSTRUCTION SPECIFICATIONS (1 OF 2) G5 GENERAL CONSTRUCTION SPECIFICATIONS (2 OF 2) AS1 ARCHITECTURAL SITE PLAN AD1 SELECTIVE DEMOLITION FLOOR PLAN 10-01-2014 A1 FLOOR PLAN A2 REFLECTED CEILING PLAN A3 ROOF PLAN A4 ENLARGED PLANS 10-01-2014 A5 BUILDING ELEVATIONS A6 BUILDING SECTIONS AND DETAILS A7 INTERIOR ELEVATIONS 10-01-2014 A8 DETAILS L1 LANDSCAPE SITE PLAN L2 LANDSCAPE SITE DETAILS L3 LANDSCAPE SITE DETAILS S1 REC HALL - STRUCTURAL GENERAL NOTES S2 RESTROOM STRUCTURAL PLANS S3 BATHROOM ADD'N PLANS S4 STRUCTURAL DETAILS S5 STRUCTURAL DETAILS M1 REC HALL MECHANICAL PLAN 10-01-2014 M2 REC HALL MECHANICAL SCHEDULES M3 REC HALL MECHANICAL KITCHEN HOOD M4 REC HALL MECHANICAL KITCHEN FAN P1 REC HALL PLUMBING PLAN 10-01-2014 P2 REC HALL PLUMBING SCHEDULES E1 REC HALL ELECTRICAL SITE PLAN E2 REC HALL POWER PLAN E3 REC HALL LIGHTING PLAN 10-01-2014 E4 REC HALL DETAILS AND SCHEDULES E5 ELECTRICAL SPECIFICATIONS AND DETAILS 3 December 2014 1 Lockhart State Park Project #122922 CCC Built Recreation Hall Renovations HVAC Work The extent of HVAC, Kitchen Hoods and Exhaust Fans is shown on the Drawings and includes the following work: 1. Installation of new Kitchen Hood with associated exhaust fan and fire suppression system shall be added to serve kitchen cooking equipment and provide added safety. 2. Installation of multi-split HVAC system within the men & women restrooms shall condition those spaces only. 3. Installation of conventional split system installed in new closet shall serve the kitchen, back rooms and the enclosed pavilion. 4. Installation of exhaust fans & ductwork in restrooms & janitor closets to properly ventilate those spaces.