Specifications include, but are not limited to: Boude Storey Middle School is located at 3000 Maryland Ave., Dallas, TX 75216. The total area to be renovated is approximately 2,500 SF. - Project consists of the following: 1. Demolition 2. Gypsum board wall system 3. Suspended acoustical ceiling system 4. New laboratory casework 5. Interior finishes 6. Doors, frames and hardware 7. Lighting 8. Electrical modifications 9. HVAC and ductwork modification 10. Plumbing 11. Technology Barbara Manns is located at 3313 S. Beckley Ave., Dallas, TX 75224. The total area to be renovated is approximately 2,800 SF. - Project consists of the following: 1. Demolition 2. Gypsum board wall system 3. Suspended acoustical ceiling system 4. New laboratory casework 5. Interior finishes 6. Doors, frames and hardware 7. Lighting 8. Electrical modifications 9. HVAC and ductwork modification 10. Plumbing 11. Technology infra-structure