Specifications include, but are not limited to: #101-Dispatch Area: •Remove dispatch door and window unit•Remove portion of walls between dispatch and training office and between dispatch and alcove area•Remove portion of wall in training room for new door•Remove portion of wall between evidence rooms•Build new wall to close off alcove and install existing aluminum window and door units•Install header beams and frame in 1/2 wall between dispatch and alcove and training room•Build wall behind evidence lockers•Add floor in evidence locker area•Repair flooring in dispatch area•Tape, bed, texture and paint all new material•Install temporary walls and dust protection as needed•Raise HVAC wall unit 2"•Install new LED lights and electrical outlets and switches•Clean up and haul off debris#102-Men's Locker Room:•Remove door unit•Remove 20' x 8' wall•Install a header beam•Tape, bed, texture and paint new wall.