Specifications include, but are not limited to: Work includes demolition of existing wet well concrete divider walls, submersible pumps and control panel, valves and piping, flow meters, float switches, gas detectors, stairs, handrails, ladders, grating, hatch frames, doors, lighting, conduit, wire, ventilation fans, ductwork, and water service piping. Work also includes providing a new concrete sump area in the wet well, coatings, metals, grating, submersible pumps, pump control panel, control system integration, valves and piping, flow meters, level sensors, gas detectors, ventilation fans and ductwork, stairs, handrails, hatches, doors, lighting, conduit, wire, junction boxes, motor starters and other electrical work.