Specifications include, but are not limited to: Upgrading of the existing Westwoods Subdivision Storm Water Management Pond with portions located in County owned public open space, DelDOT right-of-way, and county owned access easements. Work will include but not limited to: clearing and grubbing, removal of trees, replacing the existing discharge barrel with 24” reinforced concrete pipe, installation of a concrete cradle, flared end sections, filter diaphragm, riprap, grading of the pond side slopes, backfilling and compaction of embankment, planting of trees and shrubs, installation of erosion and sediment controls in accordance with the contract specifications and drawings. The work is located within the Westwoods Subdivision along Westwoods Boulevard in Hockessin, Delaware.