Specifications include, but are not limited to: The improvements consist of furnishing all labor and materials for this contract. This project involves installing signalized pedestrian crossings across the north and south legs of the US 40 at SR 7 intersection and sidewalk connections near the intersection and other incidental construction in accordance with the location, notes and details shown on the plans and as directed by the Engineer. 1.00 LS CLEARING AND GRUBBING 814.00 CY EXCAVATION AND EMBANKMENT 366.00 CY STRUCTURAL EXCAVATION 121.00 CY BORROW, TYPE F 1.00 LS REMOVAL OF STRUCTURES AND OBSTRUCTIONS 704.00 SY REMOVAL OF PCC PVMT, CURB AND SIDEWALK 554.00 CY GRADED AGGREGATE BASE COURSE, TYPE B 78.00 CY GRADED AGGR BASE COURSE, TY B, PATCHING 214.00 TON SUPERPAVE TYPE C, PG 64-22 (CBSTONE) 39.00 TON SUPERPAVE TYPE C, PG 76-22 (CBSTONE) 60.00 TON SUPERPAVE TYPE B, PG 76-22