Specifications include, but are not limited to: Fred Florence Middle School Project consists of the following: The scope of work at Fred F. Florence Middle School includes science Labs renovation/ conversion includes the following: Renovate science rooms 102 104 109 110 111 114 and 117. Renovate prep rooms: 103 109A 110A and 114A. Science Lab conversions will be Rooms: 213 and 320. Prep Rooms will be Rooms: 213A and 320A. Convert (2) existing classrooms into DISD complaint science labs with new science prep rooms. Including the following: 1. Demolition 2. Finishes (gypsum board, resilient flooring, acoustical ceilings, paint) 3. Cabinetry and millwork 4. Plumbing 5. HVAC 6. Fire protection 7. Electrical 8. Controls 9. Low voltage wiring.