Specifications include, but are not limited to: Contractor shall provide electrical service to trench, install conduit, and wiring for the new Modular Trailer that will be used for the training officer’s storage at the CHP Oroville Area office. The Contractor shall follow all the building codes and regulations. Work shall be done in accordance with the following specifications: 1. Contractor is responsible to supply a 50 amp 120/240 volt, single phase electrical feed to the modular trailer in the back of the rear secure parking lot. 2. Contractor is responsible to change the main breaker on the modular trailer from a 125 amp breaker to a 50 amp breaker. 3. Contractor is responsible to supply the electrical feed to originate from Panel A in main electrical room. 4. Contractor is responsible to run approximately 230’ of 1” conduit with 3 #4AWG and 1 #8AWG ground. 5. Contractor is responsible to trench approximately 70’ through the rear secure parking lot to the modular trailer.