Specifications include, but are not limited to: The demolition and renovation scope will be approximately 2.259 GSF of the existing space in the Hoblitzelle Building G for the Mineral Metabolism department. This space will require the demo and removal including but not limited, to existing flooring, base, walls, ceilings (gypsum, acoustical, plaster), ductwork, plumbing piping, lights, doors, door frames, med gas piping, plumbing fixtures, shelving, cabinetry, fire extinguishers, wall mounted equipment and brackets, walk off mats, fire sprinklers, fire alarm devices, HVAC equipment, electrical equipment, chilled and hot water piping, coordination of demo for asbestos containing materials, sanitary piping, electrical receptacles, lighting, switches, smoke detectors, A/V devices and equipment, security devices and equipment, electrical panels, time clocks, medical gases, disconnects, electrical transformers, J-boxes, plywood paneling, electrical conduit, all wiring, all switches, and telephone as shown on the drawings.