Specifications include, but are not limited to: New ultraviolet (UV) disinfection equipment and contact basin modifications; new UV Control Building including various architectural, structural, mechanical, and electrical improvements; new centrifuge for thickening waste sludge; garage expansion including various architectural, structural, mechanical, and electrical improvements; Chlorine Building rehabilitation including various architectural, structural, mechanical, and electrical improvements; new sludge pumps; new effluent pumps and valve vault; new 6-inch, 24-inch, 30-inch and 42-inch diameter forcemains; new 10-inch, 15-inch, 36-inch and 48-inch gravity sewer pipelines with various manholes and vaults; new 72-inch diameter outfall pipeline; new trickling filter equipment; new final clarifier equipment; new secondary digester covers; new digester gas piping; new vacuum truck receiving bay; new yard piping, valves and gates; storm water improvements; protective coatings; concrete and asphalt pavements; communication and power distribution improvements; network security improvements; instrumentation, controls and SCADA improvements and all other improvements.