Specifications include, but are not limited to: The Environmental Complex Parking generally consists of, but is not limited to, construction of new pavement areas, overlay of existing pavement, installation of porous concrete or porous asphalt with under drain piping, demolition of existing grass islands and curb, and installation of depressed landscape island and filter strips. The work also includes all requirements to provide fully finished and operable facilities including miscellaneous items and operations as shall be indicated, shown, specified or required to complete the work in strict conformity with the Contract Documents. The Contractor shall provide all labor, equipment, tools, appliances, materials and incidentals and shall perform all operations required to completely finish all of the work in the manner approved by the Engineer.