Specifications include, but are not limited to: The purpose of this study was to determine the general subsurface conditions at the existing site and to provide guidance pertaining to soil conditions for the future construction of buildings, pavements, storm water management best management practices (SWMBMP's), and underground utilities. The parcel being investigated is currently a vacant field located in the southwestquadrant of the intersection of Graves Road and Newport Gap Pike in New CastleCounty, Wilmington, Delaware. See Figure 1 in the Appendix.The proposed project consists of a new elementary school of approximately 70,000square feet with classrooms, administration, gymnasium, media center, and a cafeteria.The classrooms are two stories with the remaining sections typically one story. Therewill be no basements. The foundation loads are expected to be up to 4,000 pounds perfoot for continuous foundations and 150 kips for column footings