Specifications include, but are not limited to: Work included in this contract consists of, but is not necessarily limited to, all labor, materials and equipment for: Earthwork, Exterior Improvements, Utilities . This contract also includes, but is not necessarily limited to, all labor, materials and equipment for the following: Provide sitework, storm, sanitary and water utilities, paving, curbs, walks and topsoil/seeding. Furnish, install, maintain and remove sediment control system including sediment control plan. Maintain sediment control until substantial completion established by DNREC. Clearing, grubbing and removal of trees, roots and stumps. Site demolition as shown on the Drawings. Topsoil stripping and stockpiling on site. Contractors should carefully review the soil borings as they relate to the extent of rubble to be removed and other man made obstructions. Saw cutting and removal of sidewalks, curbs, etc. in the performance of work is this Contractors responsibility. Rough grading for area defined on site drawings for building, lawn areas, bituminous roads, parking and walkways. Preparation of subgrade for building slabs, walks and pavements. Furnish, install and maintain select fill under slab. Provide a certified construction reviewer (CCR) to perform inspections and provide written reports signed and sealed by a professional engineer. Provide all DelDOT permits related to work for this project. Remove/relocate utilities including, but not limited to water, sanitary, and storm. Furnish, install, maintain and remove temporary site fencing, temporary walks as shown