Specifications include, but are not limited to: The improvements consist of furnishing all labor and materials for patching and thin overlay. 6.00 CY UNDERCUT EXCAVATION, PATCHING 15.00 TON GRADED AGGREGATE BASE COURSE, TYPE B 25.00 CY GRADED AGGR. BASE COURSE, TYPE B, PATCH 4,000.00 TON BIT CONC, SP, TY C, 160 GYRA, PG 64-22 ( 2,000.00 TON BIT CONC, SP, TY C, 160 GY, PG 64-22, PA 60.00 TON BIT CONC, SP, TY B, 160 GY, PG 64-22, PA 150.00 TON BIT CONC, SP, BCBC, 160 GY, PG 64-22, PA 17,500.00 TON THIN BIT CONC, SP, TY C, 160 GYRA, PG 70 8.00 TON HT-MX BIT CON &/OR COLD LAID BIT (TRM) 32,000.00 GAL BITUMINOUS ASPHALT TACK COAT 1,400.00 SYIN BITUMINOUS CONCRETE PATCHING 180.00 SY PATCHING P.C.C. PAVEMENT, 6' TO 15', TYP 120.00 SY PATCHING P.C.C. PAVEMENT GREATER THAN 15 570.00 EACH DOWEL BARS