Specifications include, but are not limited to: The Contractor will provide the following services: A. Replace weather stripping on two exterior (2) South doors. B. Replace electric strike on South door. C. Replace exit devise on modular building door. D. Remove and replace the existing one (1) exterior metal door and hardware on the West side of the building. Paint new door existing color, and dispose of existing door and hardware. Exterior door should be installed per specifications below. a. (1) HM Door 3’0”x 6’8” 1 -3/4 18ga. w/cutout; b. (1) Vision Lite (window) – Lo Pro 7”x22’; c. (1) ¼” Clear Tempered Glass; d. (1) Exit device; e. (1) Surface Closer; f. (1) Door Sweep; g. (1) Weather Strip; h. (1) Latch Guard; i. (1) Electric Strike. E. Replace three key pads with equal.