Specifications include, but are not limited to: Work consists of installation of bio-filtration swale, modifications to a concrete weir, riprap outlet protections and splash pad, gabion baskets, upland plants, wetland plants, fascine bundles, coir logs, erosion and sediment controls. The projects includes backfilling and grading of existing farm pond within the Village of Murderkill River Watershed. Work includes retrofitting an existing stormwater pond to a dry pond with bio-swale detention areas modification of existing stormwater outlet structure installation of riprap within existing forebays selective concrete demolition installation of two gabion and riprap reinforced spillways extensive soil bioengineering consisting of live stake branching, coir logs, and fascine bundles. Planting of wetland and riparian seed mixes along with several hundred trees and shrubs