Specifications include, but are not limited to: The City of Montpelier (City) is requesting bids from qualified construction contractors to construct a shared use path, resurface an existing roadway and reclaim/widen an existing roadway to add on-road bike lanes. Work will include the construction of retaining walls, 2 bio retention ponds, storm drains, relocating a portion of a municipal waterline, constructing a small sewer pump station, landscaping and associated traffic signs and markings. The railroad yard at Granite Street will be reconstructed and relocated. The shared use path is approximately 6000 feet long, the roadway to be resurfaced (gravel) is 2600 feet long and the reclaimed roadway is 1560 feet long.