Specifications include, but are not limited to: The site of work is located within the city limits of Boulder City, Nevada; more specifically, crossing a portion of Boulder City Parkway (US‐93) west of Veterans Memorial Drive. This work shall include furnishing all labor, material and equipment to complete the Eldorado Valley Waterline Extension – Phase II project as described in the specifications and shown in the plans. Work includes excavation of approximately 1,230 linear feet of trenching, installation, and backfilling of a 16” C900‐16 PVC waterline. This work shall also include the installation of 6” blow‐off, 4” AVAR, & tee assemblies, valves, bends, restraint fittings, and other miscellaneous related items. This work shall include the installation of approximately 300 linear feet of 30” steel pipe casing by a bore and jack method under existing Boulder City Parkway and an existing railroad track. This project also includes the installation of approximately 40 square yards of asphalt paving in a three inch section.