Specifications include, but are not limited to:. The Work Generally consists of furnishing all labor, skill, equipment, and construction materials to construct the upgrades at the existing Grand Forks WWTF in accordance with the plans and specifications. The Project scope includes: General Construction oUV Disinfection Improvements Retrofit of open channel UV Disinfection into MBF Basin 8. The UV System Supplier has been pre-selected to enter into a contract with the successful construction contractor bidder to supply the UV system at a fixed cost and scope determined by the preselection process. Select demolition and modifications to existing MBF channel and addition of sluice gates with actuators Wall, operating floor, and concrete additions/modifications in MBF Basin 8 Pipeline and flow meter additions Platform grating, facility egress, and traveling bridge crane HVAC additions/modifications Associated electrical and I&C improvements Extensionofa16”MBFrecyclesupplyA water quality and sampling station