Specifications include, but are not limited to: 201.10 0005 CLEARING AND GRUBBING, INCLUDING INDIVIDUAL TREES AND STUMPS 1.000 LS 203.15 0010 COMMON EXCAVATION 2,500.000 CY 203.16 0015 SOLID ROCK EXCAVATION 310.000 CY 203.17 0020 UNCLASSIFIED EXCAVATION 450.000 CY 203.30 0025 EARTH BORROW 1,650.000 CY 204.20 0030 TRENCH EXCAVATION OF EARTH 6,600.000 CY 204.21 0035 TRENCH EXCAVATION OF ROCK 1,550.000 CY 204.22 0040 TRENCH EXCAVATION OF EARTH, EXPLORATORY (N.A.B.I.) 1.000 CY 204.25 0045 STRUCTURE EXCAVATION 800.000 CY 204.30 0050 GRANULAR BACKFILL FOR STRUCTURES 950.000 CY 210.10 0055 COLD PLANING, BITUMINOUS PAVEMENT 127,700.000 SY 213.10 0060 MILLED RUMBLE STRIPS (CENTERLINE) 2,100.000 LF 301.28 0065 SUBBASE OF CRUSHED GRAVEL, FINE GRADED 30,700.000 TON 301.35 0070 SUBBASE OF DENSE GRADED CRUSHED STONE 900.000 CY 310.20 0075 RECLAIMED STABILIZED BASE 134,200.000 SY 402.13 0080 AGGREGATE SHOULDERS, RAP 2,200.000 TON 406.50 0085 PRICE ADJUSTMENT, ASPHALT CEMENT (N.A.B.I.) 1.000 LU 490.30 0090 SUPERPAVE BITUMINOUS CONCRETE PAVEMENT (PG 70-28)(SBS POLYMER) 23,300.000 TON 490.31 0095 AIR VOIDS PAY ADJUSTMENT (N.A.B.I.) 1.000 LU 490.32 0100 MAT DENSITY PAY ADJUSTMENT (N.A.B.I.) 1.000 LU 490.33 0105 SURFACE TOLERANCE PAY ADJUSTMENT (N.A.B.I.) 1.000 LU 490.34 0110 LONGITUDINAL JOINT COMPACTION PAY ADJUSTMENT (N.A.B.I.) 1.000 LU 516.10 0115 BRIDGE EXPANSION JOINT, ASPHALTIC PLUG 85.000 LF