Specifications include, but are not limited to: WORK TO BE PERFORMED UNDER THIS PROJECT INCLUDES COLD PLANING AND RESURFACING OF THE EXISTING HIGHWAY WITH A LEVELING AND WEARING COURSE, NEW PAVEMENT MARKINGS, GUARDRAIL, SIGNS, SHOULDER WIDENING, CULVERT REPLACEMENTS AND OTHER RELATED HIGHWAY ITEMS. RICHFORD STP 2916 (1) BEGINNING IN THE TOWN OF RICHFORD ON VT ROUTE 105A AT STA. 0+15.84 (MM 0.003) AT THE INTERSECTION WITH VT ROUTE 105 AND CONTINUING NORTHERLY ALONG VT ROUTE 105A FOR A DISTANCE OF 9,234.72 FEET (1.749 MILES) TO STA. 92+50.56 (MM 1.7521) TO THE EXISTING BRIDGE JOINT AT THE CANADIAN BORDER. WORK TO BE PERFORMED UNDER THIS PROJECT INCLUDES OVERLAY OF THE EXISTING HIGHWAY WITH A LEVELING AND WEARING COURSE, NEW PAVEMENT MARKINGS, GUARDRAIL, SIGNS, SHOULDER WIDENING, CULVERT REPLACEMENT, SLOPE STABILIZATION AND EROSION CONTROL, DRAINAGE IMPROVEMENTS, BORDER STATION PAVING, AND OTHER HIGHWAY RELATED ITEMS.