Specifications include, but are not limited to: This project is for the replacement of the water main and street reconstruction including street lighting and traffic signals on 4th Street South from 13th Avenue to 2nd Street, 10th Avenue South from 4th Street to the east and 11th Avenue South from 4th Street South to the east. Purpose The existing watermain to be replaced is 8”cast iron pipe(CIP), which was installed over 90 years ago and is being replaced to minimize impacts and costs associated with breaks. Replacement of the water main with DR-18 PVC pipe will correct the situation. The existing concrete pavement was installed in 1952 with street patching done throughout the years and is currently overlaid with asphalt. The reconstruction will include new doweled concrete pavement with bike lanes along the curbs. Aging streetlights will be replaced with new LED street lights on the entire project area. New traffic signals will replace the existing ones at the intersection of 4th Street South and 8th Avenue.