Specifications include, but are not limited to: deliver potable water to Pueblo and County residents in the Pojoaque Basin by collecting and treating water from the Rio Grande. The water will then be transmitted, stored, and delivered to local residents, as authorized by the Aamodt Litigation Settlement Act Phase 1 of the PBRWS project is being delivered under a design-build contract consisting of subsurface raw water intake facilities from the Rio Grande, a new 6.3 million gallon per day drinking water treatment plant, treated water storage tanks, a pump station and approximately 30 miles of water transmission and distribution pipelines ranging in size from 6-30 inches. Phases 2 and 3 of the project will be procured and constructed under separate contracts.