Specifications include, but are not limited to: The City of Minot is requesting qualification submittals for reporting, permitting, design and construction engineering services for its System Wide Improvement Framework (SWIF) on the City’s existing flood control system in the City of Minot. The project will include updating a yearly Emergency Action Plan, yearly SWIF report to the USACE, investigation of ROW and surveying of existing easements, along with the design and construction engineering of improvements identified from yearly levee and flood control inspections to bring the City of Minot into compliance with our current approved plan submitted to the USACE. Work shall include but not be limited to repair of existing levees, storm water drainage systems, tree removal, erosion areas and all other items identified in the USACE levee inspections.