A. Verify and insure that all utilities, piping and conduit have been disconnected before proceeding with the demolition work. B. Clear and remove the entire structure including all pipes, equipment, wires, reinforcing steel, foundations and footings etc. which are wholly or partially exposed or above grade. C. Remove from the premises all rubble, debris and chattel (inside the structure) resulting from the demolition work. D. Insure that all holes or cavities are filled so as to leave the premises in a clean, safe and sanitary condition. E. Be fully responsible for the disconnection of all utilities and removal of sanitary installations. F. Insure that septic tanks are pumped-out and abandoned in accordance with the regulations of the State of Florida Department of Health and Rehabilitation Services (H.R.S.). Permits for and inspections of abandoned septic tanks shall be obtained from H.R.S. The contractor is responsible for Septic tank abandonment at each job site and must submit the original of the H.R.S. permit and signed final inspection with each invoice. G. Not remove trees, palms, or shrubs except those which of necessity must be destroyed in performing other work required under these Specifications